Skip to content

Earned Value Management Project Scheduler
Company | Booz Allen |
---|
Location | Chantilly, VA, USA |
---|
Salary | $77600 – $176000 |
---|
Type | Full-Time |
---|
Degrees | Bachelor’s |
---|
Experience Level | Senior |
---|
Requirements
- 5+ years of experience in a professional program planning or project scheduling role
- Experience with industry-standard scheduling tools such as Microsoft Project
- Experience with Critical Path Analysis
- Experience with Microsoft Excel formulas and pivot tables
- Ability to perform detailed schedule analysis and variance reporting
- Active TS/SCI clearance; willingness to take a polygraph exam
- Bachelor’s degree
Responsibilities
- Drive EVM program planning and scheduling operations to develop, update, maintain, and analyze the Integrated Master Schedule (IMS)
- Collaborate directly with the Program Cost Analyst and work closely with a variety of project management personnel to ensure schedule alignment with project milestones and objectives
- Perform schedule analysis to identify and mitigate risks
- Instill appropriate change management and control
- Prepare EVM metrics and status reports
- Conduct regular schedule reviews
- Validate schedule data integration
- Contribute to ongoing process improvement initiatives
- Ensure compliance with industry standards for project scheduling
- Support program startup and planning activities
- Facilitate the monthly Business Rhythm throughout the execution lifecycle
Preferred Qualifications
- Experience with large-scale projects in industries such as defense, aerospace, or IT
- Experience on a program with EIA-748 Earned Value Management System (EVMS) requirements and IMS and CPR, IPMR, or IPMDAR Deliverables
- Experience with DCMA 14-Point and DCMA EV Compliance Metrics (DECM)
- Experience with Integrated Baseline Reviews (IBRs)
- Experience running and reporting on Schedule Risk Assessments (SRAs)
- Experience with Agile Methodology and Atlassian tools, including Jira and Confluence
- Knowledge of Federal Acquisition Regulation (FAR) and Defense Federal Acquisition Regulation Supplemental (DFARS)
- Possession of excellent written and verbal communication skills to present complex data to non-technical stakeholders
- Possession of excellent attention to detail, analytical skills, and commitment to delivering high-quality results
- Project Management Professional (PMP), Scheduling Professional (PMI-SP), or EVM Certification